نوع المستند : مقالة علمية و بحثية
المؤلف
أستاذ مشارك، قسم القانون الخاص، كلية الحقوق، جامعة قم، قم، إيران
المستخلص
الكلمات الرئيسية
عنوان المقالة [English]
المؤلف [English]
The article with analytical snd comprative method discus on liability of cotractor and architect engineer in building contract at bulding duration and afterit's delivery. reasearch question is ; whatis nature and conditions of conractor and engineer liabilty after delivery of bulding?.the subject has very important in many aspects especialy of protection of owner who is a none professional person onbuilding and the defects in builing time duration and meanwhile after it's delivery.the basic question is: what is nature and conditions of contractor and architect engineer liability? we cnclud that: with attention to article870 of iraqi civil act and article 651 of egyptian civil act, the nature of the liability in contract tim is contractualy and afterbuilding delivery is legal as termed to ten(oshry) liability elements of the liability are: fault(contracual or none contractual, loss and causation. We coclude that: the nature and conditions of the liability in both iraqi law and egyptian law is same.the article is produced wih an introductio an two chapters.
الكلمات الرئيسية [English]
منابع
القوانين
Sources
قوانین
۱) قانون مدنی اردن شماره ۴۰ مصوب ۱۹۷۶
۲) قانون مدنی عراق شماره ۴۰ مصوب ۱۹۵۱
۳) قانون مدنی فرانسه مصوب ۱۸۰۴
۴) قانون مدنی مصر شماره ۱۳۱ مصوب ۱۹۴۸